Day

Date

Task / Assignment

Monday

051098

  • Update Week Thirteen's summary to the webpage.
  • Wrote email to Mrs Ho-Tan Liang Gek on the minutes of the 7th meeting.
  • Work on the final presentation of the report on Issues surrounding the Building of an Autonomous Bibliography Building Agent.
  • Update the report's content's page. (Ready for printing and binding before submission.)
  • Work on "WebVat". Checking through problems encountered since last Friday.
  • Update Visual Basic Webpage for changes to the Microsoft Visual Basic website for the latest version 6.0.
Tuesday

061098

  • Continue with Web Validator. Figure out what is wrong with the retrieval of source codes.
  • Decided to carry on working with the listing of hyperlinks.
  • Work on another new program to that will just concentrate on both the validation and error listing part.
  • Able to list down a number of badhyperlinks with the specific URL being validated as well as the time and date of validation. However, the program was still unable to retrieve repeatedly the Source codes. The Visual Basic program has to be shut down first before running the program again.
  • Read up 1001 Visual Basic Programmer's Tips and use the CD-rom provided to look for relevant codes to be used.
Wednesday

071098

  • Proceed on transferring the codes from the testing program to my actual "WebVat".
  • Test "WebVat". Able to list out all bad hyperlinks.
  • Still unable to work out the inserting of the BAD string to a file but could add it to the bad hyperlinks.
  • Consulted fellow attachment student, Adrian but could not figure it out too.
  • Search Internet for relevant samples to help with this problem using WebFerret.
  • Left work at 4pm for the Study Trip briefing back at Temasek Polytechnic at 6pm.
Thursday

081098

  • Tried to list out error log into another separate form but unable to do so.
  • Decided to put the listing out of the error log into the same main form.
  • Change layout of "WebVat".
  • Worked out new command codes for the error log.
  • Tried working for appending the BAD string but still could not figure out how. Have a simple example but coding does not work with the main Web Validator.
  • Prepare for submission by transferring the command codes into a word document.
  • Write out Project WebVat's Introduction and Objectives. Any rooms for improvements and Conclusion.
  • Refinalize report details.
Friday

091098

  • Print out report. (At home)
  • Went up 3rd floor to do binding.
  • Test and check on final "WebVat" to see that it is working.
  • Hand up both report writing and program "WebVat".
  • View through my attachment website and take notes of any updations required for the following week..
  • Work on my attachment report. Set out structure of how the photographs of the organization are to be placed.
  • Carry on with my Job Description section.
  • Upload all assignments documents to webpage.
Saturday

101098

Company Off
Sunday

111098

Company Off

  • Wrote weekly summary of task/assignment.

 

If you wish to view the old webpage I made, click here to download.

| Back to Previous Page |

waveline.gif (2395 bytes)

      Created on 5th October 1998. Last revised on 11th October 1998.

atmail.gif (26386 bytes) Creator : Daniel Chua